Wiima Dry Dock Connector allows ship modernization subcontractors to seamlessly log and pool container volumes for project-linked charter sailings, eliminating the massive costs of independent shipping.
Our flagship charter line currently serves ship repair projects at the Grand Bahama Shipyard, illustrating the exact efficiency our pooling platform delivers worldwide.
Enjoy an optimized 25-day transit time from Finland directly to the Bahamas, specifically timed to sync exactly with the modernization drydock schedule.
We require a collective minimum of 100 TEU from all participating suppliers. Once the total platform demand reaches this threshold, everyone gets to ship their portion efficiently at standard charter-level economics—no matter their individual size.
Carrier containers are freely available at origin and destination with zero unexpected demurrage or rental surprises. Furthermore, our chartered vessels are breakbulk capable, perfect for oversized cargo like prefabricated cabins.
The platform is designed to provide maximum transparency while demanding zero immediate financial commitment during the demand-gathering window.
Browse the platform for upcoming global shipbuilding projects. (Currently featuring live projects at Freeport, Bahamas).
Use the intuitive dashboard to easily indicate your required TEUs or breakbulk volume for a specific sailing, without any immediate firm commitments.
Once the collective threshold (the 100 TEU minimum) is met organically on the platform, Wiima locks in the shared charter and guarantees the route economics for all participants.
Skip the platform queues. If your project has complex breakbulk requirements or strict timelines, reach out directly to us.